§ 00 · Technology partner / Mekong delta · VietnamLAT 10.0452 · LON 105.7469
A closed-loop technology ecosystem

Build · Automate · Evolve.

KonexForge builds and operates six layers of technology — from physical sensors to AI models — in one continuously optimizing loop. Not an agency, not plain outsourcing — this is a technology partner.

Pilot 2026 · Commitments
Pilot Build
6–8 weeks
fixed scope
Team / pilot
2–4 eng
senior
Support SLA
30 days
post-launch
Closed loop
6 domains
1 system
Now accepting our first Pilot Build · Can Tho, Vietnam
IOTSERVER & DBANALYTICSAIDEVELOPMENTOPTIMIZATION
§ 02 · The closed loop · data flow topologydiagram / v.2026
Closed-loop architecture

Data flows in a loop — there's no dead end.

Most technology projects fail because their layers are disconnected: sensors don't talk to the database, dashboards don't feed back to the model, models don't retrain on new data. KonexForge designs every layer to feed back into the one before it.

A
Sensor → Edge
MQTT broker · 12 ms p99 latency
B
Edge → Cloud
Streaming ingest · 1.2 M events/min
C
Cloud → Model
Online + batch inference
D
Model → UI → Human
Decision in < 800 ms
Feedback → Retrain
Weekly · automated
01IoT & Sensors02Server & Database03Data Analytics04AI & ML05Development06Optimization LoopCLOSED LOOPB·A·E
§ 03 · Commitments for our first Pilot · 2026founding cohort
6–8
Weeks / Pilot Build
2–4
Senior engineers / pilot
< 4h
Response time (SLA)
30
Days of support after handover
§ 04 · Examples of technical capabilityAll work ↗
Manufacturing · IoT + AI

Predictive maintenance for 4 steel plants

A network of 3,200 vibration sensors cut incident downtime by 41% across 4 steel plants.

Logistics · Analytics

Route intelligence for a 600-truck fleet

An ETL pipeline + ML routing saved 18% in fuel across 600 trucks.

Fintech · Dev + AI

KYC automation for a tier-1 fintech

An LLM agent auto-approves 92% of KYC applications in under 8 seconds.

Gov · Server + IoT

Smart water grid for urban infrastructure

A water-quality monitoring system covering 12 districts.

Retail · Loop

Demand forecasting for 240 F&B stores

A weekly-retrain feedback loop for 240 F&B stores.

Ready to forge?

Build · Automate · Evolve.
Start your first loop with KonexForge.

An 8-week pilot · no long-term commitment · ending with a technical report you can take anywhere.